(402) 320-4131   |   paul@pjkarchitecture.com

About

Home » About

Dobry_PaulKellyBioPortrait_Dec2011_Square    Paul J. Kelly, RA, NCARB, LEED AP

With over 20 years of experience on diverse project types and scales, Paul brings an ability to coordinate large-scale facility decisions with a consideration for how the individual element parts fit together.  A believer that the Architect needs to embrace all the elements that make up a project, he is responsible for all aspects of initial project design, document production, technical detailing and construction administration throughout the building process.

Having been fortunate to study in Europe for an academic year, Paul brings a sensitivity to context and existing conditions that strives to fit seamlessly with existing assets, while complimenting and augmenting them to become more than they were before.

Paul is responsible for all aspects of architectural project management, from the physical evaluation of existing building systems and components to coordination of all consultant engineers and designers as part of your project.

Education

Bachelor of Architecture, University of Notre Dame, 1990

Creighton Preparatory School, 1985

Professional Affiliations

National Council of Architectural Registration Boards

LEED Accredited Professional, December 2008

Community Involvement

Omaha GOATS Rugby: 1990-93;  National Trust for Historic Preservation Member:  1990-99; Knights of Columbus, 1997 to present – Current Financial Secretary for Council 11800;  CYSL soccer coach, 2004 to present; Memorial Park Little League Coach 2005-2007; Council Bluffs Schools Engineering Advisory Board, 2008 to present; St. Margaret Mary Home and School President, 2011-2012.

Architectural Registration

Nebraska, September 2, 1995

Iowa, June 27, 2013

 

Projects completed as an independent architect:

Inserra Residence Kitchen Remodel –   5335 Izard Street
Ideal Pure Water Logo
Dobry Studio Remodel – 7701 Pine   Circle
Baber Residence Basement Remodel –   13712 Shirley Circle
Look Residence Addition/Remodel –   10404 Rockbrook Rd
Kelly Residence Patio  – 9910 Broad Moor Road
Burke Residence Addition/Remodel –   10551 Forrest Drive
Burke Residence Addition/Remodel –   94th Avenue
Kelly Residence Addition/Remodel –   440 North 61st Street
Kelly Apartment Remodel – Elmwood   Tower – South 52nd Street
State Farm Insurance Office   Addition/Remodel – 4801 Center Street
Dobry Residence Addition – 7701   Pine Circle
Baber Residence Kitchen   Remodel/Addition – 13712 Shirley Circle
Mangia Italiana Restaurant   Expansion – 6516 Irvington Road
Rosenquist Residence Deck – 239   South 88th Street
Fleming Residence Kitchen Remodel –   2039 South 85th Avenue

 

Projects completed at BCDM and Ciaccio Dennell Group

 

AINSWORTH COMMUNITY SCHOOLS ADDITION /   REMODEL
AINSWORTH, CITY OF – COMBINED USE   FACILITY
AMERICAN-ITALIAN HERITAGE SOCIETY   FACILITIES MASTER PLAN
ASHLAND COMMUNITY RESOURCE CENTER –   MASTER PLANNING / CONCEPT DESIGN
ASHLAND-GREENWOOD ELEMENTARY SCHOOL   MASONRY TUCKPOINTING
ASHLAND-GREENWOOD ELEMENTARY SCHOOL   MISCELLANEOUS SERVICES
ASHLAND-GREENWOOD ELEMENTARY SCHOOL   RENOVATIONS
ASHLAND-GREENWOOD ELEMENTARY SCHOOL   WINDOW REPLACEMENT
ASHLAND-GREENWOOD ELEMENTARY SCHOOL   WINDOW REPLACEMENT PHASE II
ASHLAND-GREENWOOD HIGH SCHOOL CONCESSIONS   BUILDING
ASHLAND-GREENWOOD HIGH SCHOOL WEIGHT ROOM   ADDITION
ASHLAND-GREENWOOD SCHOOLS – ASHLAND HIGH   SCHOOL CORRIDOR FLOORING REPLACEMENT
ASHLAND-GREENWOOD SCHOOLS – ASHLAND STADIUM   FILM TOWER REPLACEMENT
ASHLAND-GREENWOOD SCHOOLS – BOND ISSUE   ASSISTANCE-2008
ASHLAND-GREENWOOD SCHOOLS – DISTRICT –   OFFICE REMODEL STUDY
ASHLAND-GREENWOOD SCHOOLS – ELEMENTARY   SCHOOL – 2010 ADDITION/REMODEL
ASHLAND-GREENWOOD SCHOOLS – ELEMENTARY   SCHOOL – CLASSROOM REMODEL
ASHLAND-GREENWOOD SCHOOLS – HIGH SCHOOL –   DOOR REPLACEMENT
ASHLAND-GREENWOOD SCHOOLS – HIGH SCHOOL –   WINDOW REPLACEMENT
ASHLAND-GREENWOOD SCHOOLS – HIGH   SCHOOL/MIDDLE SCHOOL – 2010 ADDITION/REMODEL
ASHLAND-GREENWOOD SCHOOLS – STADIUM   UPGRADES – 2011
BOLER, MR & MRS JAMES – RESIDENCE   ADDITION
BOYER CHUTE NATIONAL WILDLIFE REFUGE
BOYS & GIRLS HOME & FAMILY   SERVICES INC BUILDING ADDITION
BROPHY RESIDENCE REMODEL
CARRIAGE HOUSE REMODEL (ETHAN ALLEN)
CIACCIO RESIDENCE REMODEL
CIACCIO RESIDENCE SUN PORCH
CLARINDA SCHOOLS – ELEMENTARY SCHOOL   REROOF
CLARINDA SCHOOLS DISTRICT OFFICE REROOF
COCKLE RESIDENCE REMODEL
CONAGRA AIRPORT FENCING (S&W FENCE   CO)
COUNCIL BLUFFS SCHOOLS – 1997   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – 1998   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – 1999   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – 2000   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – 2001   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – 2002   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – 2003   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – 2005   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – 2007   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – 2008   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – 2009   MISCELLANEOUS REROOFS
COUNCIL BLUFFS SCHOOLS – ABRAHAM LINCOLN   HIGH 2010 REMODEL
COUNCIL BLUFFS SCHOOLS – ABRAHAM LINCOLN   HIGH ADDITION/REMODEL
COUNCIL BLUFFS SCHOOLS – ABRAHAM LINCOLN   HIGH BASEBALL FIELD RENOVATION
COUNCIL BLUFFS SCHOOLS – ABRAHAM LINCOLN   HIGH GYMNASIUM ADDITION
COUNCIL BLUFFS SCHOOLS – ABRAHAM LINCOLN   HIGH RESTROOMS
COUNCIL BLUFFS SCHOOLS – ABRAHAM LINCOLN   HIGH RESTROOMS
COUNCIL BLUFFS SCHOOLS – CARTER LAKE   ELEMENTARY – TUCKPOINTING
COUNCIL BLUFFS SCHOOLS – CARTER LAKE   ELEMENTARY ADA
COUNCIL BLUFFS SCHOOLS – CENTRAL OFFICE   ROOF REPAIRS
COUNCIL BLUFFS SCHOOLS – COLLEGE ROAD   ELEMENTARY – EARLY GRADING PACKAGE
COUNCIL BLUFFS SCHOOLS – COLLEGE ROAD   ELEMENTARY SCHOOL – NEW SCHOOL
COUNCIL BLUFFS SCHOOLS – CRESCENT   ELEMENTARY  WINDOW REPLACEMENT
COUNCIL BLUFFS SCHOOLS – CRESCENT   ELEMENTARY FIRE DAMAGE STUDY
COUNCIL BLUFFS SCHOOLS – CRESCENT   ELEMENTARY SCHOOL RENOVATION
COUNCIL BLUFFS SCHOOLS – EDISON   ELEMENTARY SCHOOL ADDITION/RENOVATION
COUNCIL BLUFFS SCHOOLS – HOOVER   ELEMENTARY 2006 REROOF
COUNCIL BLUFFS SCHOOLS – KIRN JR HIGH   MECHANICAL UPGRADES
COUNCIL BLUFFS SCHOOLS – LONGFELLOW   ELEMENTARY REROOF
COUNCIL BLUFFS SCHOOLS – LONGFELLOW   ELEMENTARY SCHOOL REROOF
COUNCIL BLUFFS SCHOOLS – OLD KIRN JR HIGH   GYM REROOF
COUNCIL BLUFFS SCHOOLS – ROOFS SURVEY
COUNCIL BLUFFS SCHOOLS – ROOSEVELT   ELEMENTARY SCHOOL ADDITION/RENOVATION
COUNCIL BLUFFS SCHOOLS – RUE ELEMENTARY   2006 REROOF
COUNCIL BLUFFS SCHOOLS – STADIUM   ACCESSIBILITY UPGRADES
COUNCIL BLUFFS SCHOOLS – THOMAS JEFFERSON   HIGH 2008 MISCELLANEOUS REMODEL
COUNCIL BLUFFS SCHOOLS – THOMAS JEFFERSON   HIGH 2009 MISCELLANEOUS REMODEL
COUNCIL BLUFFS SCHOOLS – THOMAS JEFFERSON   HIGH SCHOOL 2010 REMODEL
COUNCIL BLUFFS SCHOOLS – THOMAS JEFFERSON   HIGH SCHOOL ADDITION REMODEL-2007
COUNCIL BLUFFS SCHOOLS – THOMAS JEFFERSON   HIGH TUCKPOINTING
COUNCIL BLUFFS SCHOOLS – TUCKER CAREER   CENTER – ACADEMY REMODEL
CREIGHTON PREP HIGH SCHOOL –   RENOVATION/ADDITION PROPOSAL
D’AGOSTINO RESIDENCE REMODEL
DENISON CITY HALL FEASIBILITY STUDY
DENNELL RESIDENCE REMODEL
DEROIN RESIDENCE RESIDENCE REMODEL
DES MOINES – PERKINS ELEMENTARY SCHOOL
DUCHESNE ACADEMY – ART DEPARTMENT   RELOCATION
DUCHESNE ACADEMY – SCIENCE ROOM REMODEL
DUNDEE PRESBYTERIAN CHURCH   ADDITION/RENOVATION
DUNDEE PRESBYTERIAN CHURCH   ADDITION/RENOVATION – MASTER PLAN
EGERMAYER RESIDENCE REMODEL/ADDITION
EILERS RESIDENCE REMODEL
FIRST LUTHERAN CHURCH – PAPILLION, NE
FORT LEAVENWORTH USD # 207 – PATTON JR.   HIGH FAÇADE
FORT LEAVENWORTH USD #207 – BOARD OF   EDUCATION BUILDING (NEW)
FORT LEAVENWORTH USD #207 – BRADLEY   ELEMENTARY SCHOOL RENOVATION
FORT LEAVENWORTH USD #207 – EISENHOWER   ELEMENTARY – NEW SCHOOL
FORT LEAVENWORTH USD #207 – EISENHOWER   ELEMENTARY REMODEL – 1992
FORT LEAVENWORTH USD #207 – EISENHOWER   ELEMENTARY REMODEL – 2000
FORT LEAVENWORTH USD #207 – MACARTHUR   ELEMENTARY ADDITION / REMODEL
FORT LEAVENWORTH USD #207 – MAINTENANCE   FACILITY, PATTON SITE
FORT LEAVENWORTH USD #207 – PATTON JR   HIGH PHASE II REMODEL
FORT LEAVENWORTH USD #207 – PATTON JR   HIGH REMODEL
FORT LEAVENWORTH USD #207 – PATTON JR   HIGH REMODEL REDESIGNS
FRITZ RESIDENCE REMODEL
GRETNA HIGH SCHOOL ADDITIONS
GUCK RESIDENCE REMODEL
HAMBURG HIGH SCHOOL FRONT DOORS   REPLACEMENT
HAMBURG SCHOOLS – HIGH SCHOOL 2005   UPGRADES
HAMBURG SCHOOLS – LIFE SAFETY
HAPPY HOLLOW CLUB TECHNICAL ANALYSIS
HAYES RESIDENCE REMODEL
HILLCREST FAMILY SERVICES – COTTAGE
HOLY FAMILY SHRINE – PHASE 1 & 2   CONSTRUCTION
HOLY SPIRIT   CATHOLIC CHURCH -Spirit I
HOLY SPIRIT   CATHOLIC CHURCH -Spirit II
IMMANUEL HEALTH SYSTEMS – IMMANUEL   VILLAGE ENTRY CANOPY
KELLY, DR. GERARD – RESIDENCE LANDSCAPE   PLAN
LATHROP, MR & MRS JOSEPH W. –   RESIDENCE REMODEL
LAVISTA AQUATICS FEASIBILITY STUDY
LEXINGTON CITY ADMINSTRATIVE OFFICES   STUDY
LEXINGTON GRAND GENERATION CENTER   RENOVATION
LEXINGTON SCHOOLS – HIGH SCHOOL  WRESTLING ROOM ADDITION
LEXINGTON SCHOOLS – HIGH SCHOOL   ADDITION/REMODEL
LEXINGTON SCHOOLS – MIDDLE SCHOOL   ADDITION/REMODEL
LEXINGTON SCHOOLS – MIDDLE SCHOOL MUSIC   ROOM ADDITION
LEXINGTON SCHOOLS – MISCELLANEOUS SCHOOL   REMODELS
LEXINGTON SCHOOLS – MORTON ELEMENTARY   SCHOOL ADDITION / REMODEL
LEXINGTON SCHOOLS – PUBLIC SCHOOLS   FACILITIES MASTER PLAN
LEXINGTON SCHOOLS – PUBLIC SCHOOLS   MISCELLANEOUS SERVICES
LEXINGTON SCHOOLS – SANDOZ ELEMENTARY   SCHOOL ADDITION
LEXINGTON, NE, CITY OF – LEXINGTON PUBLIC   LIBRARY
LONGO RESIDENCE REMODEL
MAHER RESIDENCE REMODEL
MARY OUR QUEEN CHURCH REMODEL
MARY OUR QUEEN SCHOOL REMODEL
MIDWEST ORAL & MAXILLOFACIAL SURGERY   (M.O.M.S.) – OFFICE/TREATMENT SPACE REMODEL
MILLARD SCHOOLS – ABBOTT ELEMENTARY   LOUNGE & WORKROOM
MILLARD SCHOOLS – ABBOTT ELEMENTARY MEDIA   CENTER REMODEL
MILLARD SCHOOLS – ABBOTT ELEMENTARY   SCHOOL – RECEPTION DESK/SECURITY
MILLARD SCHOOLS – ANDERSEN MIDDLE CARPET   PKG
MILLARD SCHOOLS – ANDERSEN MIDDLE   REMODEL
MILLARD SCHOOLS – ANDERSEN MIDDLE WASH   FOUNTAIN REPLACEMENT
MILLARD SCHOOLS – BRYAN ELEMENTARY &   SOUTH HIGH 1992 MISC. REMODELS
MILLARD SCHOOLS – CENTRAL MIDDLE ANNEX   REMODEL
MILLARD SCHOOLS – CENTRAL MIDDLE REMODEL
MILLARD SCHOOLS – CENTRAL MIDDLE RESTROOM   REMODEL
MILLARD SCHOOLS – CENTRAL MIDDLE SCHOOL   ANNEX – MIDDLE SCHOOL ALTERNATIVE PROGRAM
MILLARD SCHOOLS – CENTRAL MIDDLE SCHOOL   REROOF
MILLARD SCHOOLS – CENTRAL MIDDLE SCHOOL   REROOF PHASE 1
MILLARD SCHOOLS – CENTRAL MIDDLE TECH LAB   REDESIGN
MILLARD SCHOOLS – CENTRAL MIDDLE VERTICAL   LIFT REPLACEMENT
MILLARD SCHOOLS – COTTONWOOD ELEMENTARY   REROOF
MILLARD SCHOOLS – DISTRICT – ROOFING   SYSTEM OUTLINE SPECIFICATIONS
MILLARD SCHOOLS – DON STROH   ADMINISTRATION BUILDING – BOARD ROOM REMODEL
MILLARD SCHOOLS – DON STROH ADMINISTRATION   BUILDING – OFFICE RENOVATION
MILLARD SCHOOLS – DON STROH   ADMINISTRATION CENTER – OFFICE RENOVATION PHASES 1&2
MILLARD SCHOOLS – KIEWIT MIDDLE DRINKING   FOUNTAINS
MILLARD SCHOOLS – KIEWIT MIDDLE REMODEL
MILLARD SCHOOLS – KIEWIT MIDDLE REMODEL   ADDITIONAL SERVICES
MILLARD SCHOOLS – KIEWIT MIDDLE SEWING   ROOM
MILLARD SCHOOLS – MIDDLE SCHOOLS REMODEL   MASTER PLAN
MILLARD SCHOOLS – MISCELLANEOUS CASEWORK
MILLARD SCHOOLS – MISCELLANEOUS REROOFS –   2000
MILLARD SCHOOLS – MISCELLANEOUS REROOFS   SURVEY
MILLARD SCHOOLS – NEIHARDT ELEMENTARY   CLASSROOM CASEWORK REPLACEMENT
MILLARD SCHOOLS – NEIHARDT ELEMENTARY   MEDIA CENTER REMODEL
MILLARD SCHOOLS – NORTH HIGH CASEWORK
MILLARD SCHOOLS – NORTH HIGH REDESIGN   BAND STORAGE AREAS & CABINETRY
MILLARD SCHOOLS – NORTH HIGH SECURITY   STATION
MILLARD SCHOOLS – NORTH MIDDLE   ADDITION/REMODEL
MILLARD SCHOOLS – NORTH MIDDLE   MISCELLANEOUS REMODEL
MILLARD SCHOOLS – NORTH MIDDLE REMODEL
MILLARD SCHOOLS – NORTH MIDDLE REMODEL   ADDITIONAL SERVICES
MILLARD SCHOOLS – NORTH MIDDLE SCHOOL   REROOF PHASE 1
MILLARD SCHOOLS – NORTH MIDDLE SCHOOL   REROOF PHASE 2
MILLARD SCHOOLS – NORTH MIDDLE STORAGE   BUILDING
MILLARD SCHOOLS – ROCKWELL ELEMENTARY   REROOF
MILLARD SCHOOLS – RUSSELL MIDDLE COMMONS   BENCHES
MILLARD SCHOOLS – RUSSELL MIDDLE SCHOOL   ADMINISTRATION AREA CASEWORK
MILLARD SCHOOLS – SANDOZ ELEMENTARY   REROOF – PHASE 1
MILLARD SCHOOLS – SANDOZ ELEMENTARY   REROOF – PHASE 2
MILLARD SCHOOLS – SOUTH HIGH CASEWORK –   1997
MILLARD SCHOOLS – SOUTH HIGH CASEWORK –   2000
MILLARD SCHOOLS – SOUTH HIGH CASEWORK –   2000 – PHASE 2
MILLARD SCHOOLS – SOUTH HIGH CASEWORK –   2002
MILLARD SCHOOLS – SOUTH HIGH HALL OF FAME   DISPLAY WALL
MILLARD SCHOOLS – SOUTH HIGH ROOF   REPLACEMENT
MILLARD SCHOOLS – SOUTH HIGH SOCCER   STORAGE BUILDING
MILLARD SCHOOLS – SPECIAL EDUCATION   EXPANSION PROJECT
MILLARD SCHOOLS – STROH ADMIN. CENTER   OFFICE REMODEL
MILLARD SCHOOLS – WEST HIGH SCHOOL DUGOUT   ROOF REPLACEMENT
MILLARD SCHOOLS – WEST HIGH SCHOOL   SECURITY DESK
MILLARD SCHOOLS – WIEBE BUILDING   MODIFICATIONS
MILLARD SCHOOLS – YAP LEASED FACILITY
MORRIS RESIDENCE REMODEL
NATIONAL ARBOR DAY FOUNDATION (E) CANOPY   TREEHOUSE #1
NEBRASKA CHILDREN’S HOME SOCIETY –   ADMINISTRATION & CONFERENCE CENTER
NECC – UTILITY LINE BUILDING
OAK HILLS COUNTRY CLUB REMODEL
O’BRIEN RESIDENCE ADDITION
OMAHA – TRANQUILITY PARK MAINTENANCE   BUILDING ADDITION
OMAHA, CITY OF – BROWN PARK RESTROOM   REMODEL
OMAHA, CITY OF – DILL FIELD CONCESSIONS   BUILDING RENOVATION
OPS – BENSON WEST ACCESSIBILITY UPGRADES
OPS – BENSON WEST ELEMENTARY SCHOOL –   ELEVATOR STUDY
OPS – BLACKBURN ALTERNATIVE SCHOOL –   CULINARY ARTS REMODEL
OPS – BRYAN JR HIGH SCHOOL TECH LAB   MODIFICATIONS
OPS – BURKE HIGH & MCMILLAN JR HIGH   SCHOOLS – ADA UPGRADE – PHASE II
OPS – BURKE HIGH SCHOOL OFFICE REMODEL
OPS – MCMILLAN JR HIGH ADA COMPLIANCE
OPS – MONROE JR HIGH ADA COMPLIANCE
OPS – MORTON JR HIGH SCHOOL LIFE   MANAGEMENT LAB REMODEL
OPS – NORRIS JR HIGH  ADA UPGRADE
OPS – NORRIS JR HIGH ADA COMPLIANCE
OPS – NORRIS JR HIGH ADA UPGRADE – PHASE   2
OPS – NORRIS JR HIGH ADA UPGRADE – PHASE   3
OPS – PARRISH ALTERNATIVE HIGH  (44TH & FARNAM FACILITY) REMODEL
OPS – WASHINGTON ELEMENTARY SCHOOL   REMODEL
OSTERGARD RESIDENCE REMODEL
PACIFIC RIDGE APARTMENTS – PHASE 2
PACIFIC RIDGE APARTMENTS – SITE – PHASE 3
PACIFIC RIDGE APARTMENTS (ROSSITTO   APARTMENT DEV)
PAPILLION-LAVISTA SCHOOLS – HIGH SCHOOL   COMPREHENSIVE MASTER PLAN
PAPIO KENO CLUB ELEVATION
POTTHOFF RESIDENCE REMODEL
PUTNAM RESIDENCE REMODEL
RALSTON SCHOOLS – BLUMFIELD ELEMENTARY   HANDICAP RAMP ADDITION
RALSTON SCHOOLS – ENERGY EFFICIENCY   IMPROVEMENTS – WILDEWOOD ELEM
RALSTON SCHOOLS – ENERGY EFFICIENCY   IMPROVEMENTS-ADMINISTRATION
RALSTON SCHOOLS – ENERGY EFFICIENCY   IMPROVEMENTS-KAREN-WESTERN ELEM
RALSTON SCHOOLS – ENERGY EFFICIENCY   IMPROVEMENTS-MEADOWS ELEM
RALSTON SCHOOLS – ENERGY EFFICIENCY   IMPROVEMENTS-MOCKINGBIRD ELEM
RALSTON SCHOOLS – ENERGY EFFICIENCY   IMPROVEMENTS-SEYMOUR ELEM
RALSTON SCHOOLS – HIGH SCHOOL 1992 REROOF   – PHASE I
RALSTON SCHOOLS – HIGH SCHOOL 1992 REROOF   – PHASE II
RALSTON SCHOOLS – HIGH SCHOOL 1992 REROOF   – PRELIMINARY
RALSTON SCHOOLS – HIGH SCHOOL 1993 REROOF   – PHASE III
RALSTON SCHOOLS – HIGH SCHOOL 1994 REROOF
RALSTON SCHOOLS – HIGH SCHOOL ELEVATOR
RALSTON SCHOOLS – KAREN WESTERN   ELEMENTARY REROOF
RALSTON SCHOOLS – MASTER PLAN UPDATE
RALSTON SCHOOLS – MEADOWS ELEMENTARY   REROOF
RALSTON SCHOOLS – MIDDLE SCHOOL TECH. LAB   REMODEL
RALSTON SCHOOLS – MISCELLANEOUS REROOFS –   PHASE I
RALSTON SCHOOLS – MISCELLANEOUS REROOFS –   PHASE II
RALSTON SCHOOLS – MISCELLANEOUS SERVICES   – ADA COMPLIANCE
RALSTON SCHOOLS – MISCELLANEOUS SERVICES   – ADA COMPLIANCE-SIGNAGE
RALSTON SCHOOLS – MISCELLANEOUS SERVICES   – ADA COMPLIANCE-VARIOUS
RALSTON SCHOOLS – MISCELLANEOUS SERVICES   – HIGH SCHOOL TECH EDUCATION
RALSTON SCHOOLS – MOCKINGBIRD ELEM.   HANDICAP ACCESSIBILITY STUDY
RAYMOND CENTRAL SCHOOLS  – BOND ASSISTANCE
RAYMOND CENTRAL SCHOOLS – CERESCO   ELEMENTARY ADDITION/REMODEL
RAYMOND CENTRAL SCHOOLS – HIGH SCHOOL   ADDITION/REMODEL
RAYMOND CENTRAL SCHOOLS – HIGH SCHOOL   SPACE PLAN STUDY
RAYMOND CENTRAL SCHOOLS – VALPAPRAISO   ELEMENTARY MASTER PLAN
RAYMOND CENTRAL SCHOOLS – VALPARAISO   ELEMENTARY ADDITION/REMODEL
RAYMOND CENTRAL SCHOOLS – VALPARAISO   ELEMENTARY WHEELCHAIR LIFT ADDITION
REGENCY CLUBHOUSE ADA REMODEL
RENNELS RESIDENCE REMODEL
RILEY BUILDING REMODEL
ROUSE RESIDENCE REMODEL
ROUSE RESIDENCE REMODEL – PHASE II
SIOUX CITY, CITY OF – CHRIS LARSEN PARK   EAST RESTROOM FACILITY
SIOUX CITY, CITY OF – SPIRIT OF SIOUXLAND   MEMORIAL CONSTR. DOCUMENTS
ST. JAMES CATHOLIC CHURCH – RECTORY ENTRY   ADDITION
ST. MARGARET MARY CHURCH MASONRY   RESTORATION – OMAHA, NE
ST. MARGARET MARY SCHOOL REROOF
ST. MARGARET MARY SCHOOL-CHURCH HVAC
ST. MARY CATHOLIC CHURCH, MOUNT VERNON IL   – ADDITION/REMODEL
ST. MARY CATHOLIC CHURCH, MOUNT VERNON IL   – MASTER PLANNING/TECHNICAL ANALYSIS/ADDITION
TANAGER PLACE CAMPUS SITE CONSTRUCTION   DOC/ADMIN.
TANAGER PLACE COTTAGES REMODEL
TRINITY INTERDENOMINATIONAL CHURCH – GYM   CEILING REVISIONS
UNIVERSITY OF NEBRASKA MEDICAL CENTER –   CENTER FOR VISUAL REHABILITATION
UTA HALEE GIRLS VILLAGE – ADDITIONAL   SERVICES
UTA HALEE GIRLS VILLAGE – KITCHEN
UTA HALEE GIRLS VILLAGE – PHASE 3   IMPROVEMENTS
UTA HALEE GIRLS VILLAGE – PHASE I   COTTAGES
VILLISCA COMMUNITY SCHOOLS – 2005 REROOFS
VILLISCA COMMUNITY SCHOOLS – ELEMENTARY   SCHOOL BOILER REPLACEMENT
VILLISCA COMMUNITY SCHOOLS – ELEMENTARY   SCHOOL HVAC ANALYSIS
WHEELER RESIDENCE REMODEL
ZENK RESIDENCE REMODEL
Scroll to top